Safeguarding Our Environment
The Clearwater Project will include comprehensive protection for the air, water, land, ecosystem and aesthetic values. As a SAGD project, it means no tailings ponds, no areas of open toxic water, and only a small drainage pond for storm water runoff (natural rain and melted snow – no fluids from inside the reservoir).
Our high environmental performance standards result from a combination of the Clearwater Project’s design, which requires less steam, and special features and technologies that enable the project to exceed provincial regulatory standards.
Please check out the following pages to see how AOS will be a good environmental neighbour. Please also check out the accompanying pages on Safe Operations, Innovations and Partnering.
